Project details
- Project Size: City Hall Lobby
- Project Location: Sarasota, Florida
- Budgeted Construction Costs: $100,000
- Completion Date: 2009
- Client: Information Available Upon Request
- Owner: City of Sarasota
Sarasota City Hall Fountain
Sarasota City Hall Fountain: Stainless-steel Structure For Granite Slabs Support
Biller Reinhart Engineering Group, Inc. performed structural design and prepared construction documents (drawings and specifications) for the stainless-steel structure supporting granite slabs of an interior laminar sheet flow fountain. BillerReinhart coordinated closely with the fabricator during the drawing preparation process and assembly installation. BillerReinhart performed site visits during the structure installation to view steel components and verify compliance with design documents.