Project details
- Project Size: Various Equipment Foundations
- Project Location: Tampa, Florida
- Budgeted Construction Costs: $500,000
- Actual Construction Costs: $500,000
- Completion Date: 2008
- Client: Information Available Upon Request
- Owner: Tampa Port Authority
Port of Tampa
Fuel Pipeline Expansion At The Port Of Tampa
Biller Reinhart Engineering Group, Inc. performed structural design and prepared construction documents (drawings and specifications) for equipment foundations, elevated structural steel equipment platforms and pipe supports for a fuel pipeline expansion at the Port of Tampa.