Project details
- Project Location: Clearwater Beach, Florida
- Completion Date: Ongoing
- Client: City of Clearwater
- Owner: City of Clearwater
Pier 60
Pier 60: Structural Engineering And Concrete Restoration Services
Biller Reinhart Engineering Group, Inc. is providing structural engineering and concrete restoration services to the City of Clearwater for the Pier 60 Concrete Pier located on the main stretch of Clearwater Beach. The pier was constructed in 1994 and stretches approximately 1080 feet into the Gulf.
BillerReinhart performed a visual assessment to observe the existing condition of the concrete pier from both the top and underside (via boat) and is currently performing a structural condition review. BillerReinhart will then prepare drawings and specifications for the restoration of the concrete pier. BillerReinhart will also be providing construction administration services during the restoration work as requested.