Project details
- Project Size: Various Equipment Foundations
- Project Location: Orlando, Florida
- Budgeted Construction Costs: $500,000 (Expansion); $250,00 (T-676 GSE)
- Actual Construction Costs: $500,000 (Expansion); $250,00 (T-676 GSE)
Orlando International Airport
Orlando International Airport: Structural Design For Fuel Pipeline Expansion
FUEL PIPELINE EXPANSION
Biller Reinhart Engineering Group, Inc. performed structural design and prepared construction documents (drawings and specifications) for equipment foundations, elevated structural steel equipment platforms and pipe supports for a fuel pipeline expansion at the Port of Tampa.
T-676 GSE STATION
Biller Reinhart Structural Group, Inc. performed structural design for the above ground fuel storage tank foundations, pipe supports and fuel containment areas.