Chapel By The Sea
Chapel By The Sea

Project details

  • Project Size: Less than 10,000 Sq. Ft.
  • Project Location: Clearwater, Florida
  • Budgeted Construction Costs: Less than $100,000
  • Actual Construction Costs: Less than $100,000
  • Completion Date: October 2017
  • Client: Information Available Upon Request
  • Owner: Information Available Upon Request

Chapel By The Sea

Chapel By The Sea: Drawings And Specifications Of Structural Steel Supports

Biller Reinhart Engineering Group, Inc. provided drawings and specifications for the restoration and painting of structural steel supports for rooftop equipment. BillerReinhart also designed rooftop equipment hold-downs, as well as verified existing roof framing member capacities for the safe support of new rooftop equipment.