Project details
- Project Size: Fifteen-Story Condominium Building
- Project Location: Tampa, Florida
- Budgeted Construction Costs: $550,000
- Completion Date: 2013
- Client: Information Available Upon Request
- Owner: Information Available Upon Request
Castillo Towers at Westshore Yacht Club
Castillo Towers at Westshore Yacht Club: Exterior Painting And Waterproofing Project
Biller Reinhart Engineering Group, Inc. prepared design drawings, specifications and bid documents for the exterior painting and waterproofing project of the fifteen-story condominium building. Castillo Tower was experiencing on-going moisture intrusion within various structural elements. The project includes the repainting of exterior painted wall surfaces for each building area; sealant application for building joints of each building area; waterproofing of exterior planters, two exterior fountains and waterproofing of exterior walkway deck surfaces. BillerReinhart performed a visual condition survey to observe the building’s exterior perimeter surfaces; exterior walls, walkway decks, planter walls, and fountains and prepared a condition survey report. Based on the results of the condition survey, construction documents (bid documents and specifications) were prepared. BillerReinhart also assisted the owner during the bidding and negotiations phase of the project and performed construction administration services; reviewed product submittals, performed site visits to observe project construction, issued reports to document observations made during site visits, and provided project correspondence as required.