THE CHALLENGE

Age-Related Deterioration in an Occupied Coral Gables Tower

The Biltmore II Condominium is a high-rise residential building in Coral Gables with an elevated parking and pool deck. The Association engaged BillerReinhart as the building approached its 50-year recertification.

The purpose of the project was to identify unacceptable structural and electrical infrastructure damage, determine causation of the deterioration, and recommend a scope of repair that would prepare the building for recertification. The scope and phasing of the restoration project were developed to keep the building operational while the age-related deterioration was addressed.

OUR APPROACH

A Condition Survey That Set the Repair Scope

BillerReinhart performed a comprehensive condition survey of the property, including the exterior columns and beams, unit balconies, stairwells, roof, parking garage, and pool deck, to evaluate the structural condition of the building. The findings were documented in a detailed condition survey report identifying observed deficiencies, with recommended repairs prioritized as immediate, near-term, or long-term based on urgency. Using the repair quantities established during the survey and structural design calculations in accordance with the Florida Building Code, our Engineers developed comprehensive repair documents. These construction documents served as the basis for contractor procurement and guided the Association through the bidding, permitting, and construction phases of the project.

“Working closely with the Association from investigation through construction, BillerReinhart developed repair documents, guided contractor procurement, and provided construction oversight to ensure the long-term performance and safety of this prominent Coral Gables residential tower.”

Restoration and Repair

Two Phases, One Continuous Restoration Program

The restoration was completed in two phases to minimize disruption to residents’ daily routines. Each phase combined structural repairs with waterproofing and finish restoration to protect the rehabilitated elements and ensure the long-term performance of the building beyond its recertification.

 

Phase One

Parking Garage, Elevated Parking Deck, and Pool Deck

The first phase renewed critical structural and waterproofing systems and extended the service life of heavily used common areas.

  • Structural concrete restoration
  • Post-tension cable repairs
  • Waterproofing replacement
  • Expansion joint replacement
  • Crack repairs
  • Pool rehabilitation
  • Traffic coatings
  • Restoration of supporting site elements

 

Phase Two

Tower Façade Restoration

The second phase addressed the tower through an extensive façade restoration program, closing out with a complete repainting of the building in an updated color scheme.

  • Concrete and stucco repairs
  • Intricate post-tension repairs
  • Sealant replacement
  • Balcony waterproofing
  • New hurricane-impact windows in the east and west corridor areas
  • Complete repainting with an updated color scheme
  • New tiling of the front entrance with an updated design

 

Roof Repairs

In addition to leading the design and overseeing construction of both restoration phases, BillerReinhart also provided consulting and construction administration services for roof repairs, giving the Association a single engineering partner to guide the building’s continued preservation and long-term maintenance.

Façade Before and After

THE OUTCOME

Recertification Achieved, Service Life Extended

Biller Reinhart Engineering Group partnered with Biltmore II Condominium to help the Association successfully complete the building’s 50-year recertification through the planning, design, and construction administration of a comprehensive, two-phase structural restoration program.

The completed program renewed the building’s structural, waterproofing, and finish systems from the garage to the roof, protected the long-term performance and safety of a prominent Coral Gables residential tower, and left the Association with a clear path for continued preservation and long-term maintenance.

Project Details

Client

Biltmore II Condominium Association, Inc.

Location

Coral Gables, Florida

Building Type

Residential High-Rise Condominium

Driver

50-Year Recertification

Scope

Two-phase structural restoration of the garage, elevated parking deck, pool deck, and tower façade, plus roof repair consulting

Deliverables

Condition Survey Report, Signed and Sealed Project Manual, Bid Analysis, Construction Summary Reports

Services Provided

Facing recertification with a repair scope you cannot size?

Our Engineers survey the building, set the repair scope, prepare the bid documents, and stay on site through construction.