BillerReinhart Structural Group, Inc. provided structural engineering services for Master Lift Stations 12A and 27A in Manatee County, Florida. The lift stations were upgraded to increase the efficiency of the systems. The upgrades included replacing eddy current motors with variable speed drives; replacing the existing centrifugal pumps with submersible dry pit pumps; modifying the buildings to accommodate bridge cranes in the drywell for pump removal; installing flow meters; replacing existing valves and piping; modifying the MCC lineup; and providing process and instrumentation diagrams.
Printable Portfolio Page |
PROJECT SIZE
Master Lift Stations 12A & 27A
EST. CONSTRUCTION COSTS
Budget $1.5 Million
Actual $1.5 Million