BillerReinhart Structural Group, Inc. performed structural design and prepared construction documents (drawings and specifications) for the new dugout structure that includes a second story press box. The construction of the structure is comprised of the following: hallow cast-in-place concrete spread footings and floor slab on grade, re inforced concrete masonry walls, steel framed elevated floor deck and steel framed roof system.
BillerReinhart reviewed shop drawings and submittals regarding structural work.
BillerReinhart performed site visits during construction to observe progress.
Printable Portfolio Page |
PROJECT SIZE
2-Story Structure
EST. CONSTRUCTION COSTS
Budget $150,000
Actual $150,000